House Construction Contract Agreement Philippines

5. Work begins on January 1, 20. 4. That the CONTRACTOR must pay a fine equal to 1% of the contract price for each day of turnover delay. 7. That the owner agree to pay 30% of the contract price at least 5 working days before the scheduled start date in the form of a down payment and the 70% balance payable in identical weekly payments based on the signing date until the expected end of the project. If necessary, additional costs must be borne as needed. 3. That the CONTRACTOR complete and surround the coffee in question at the contract price and in accordance with plans and specifications 2. To ensure the necessary building permits, the CONTRACTOR is responsible for the purchase of equipment, recruitment, coordination with the architect and the owner with regard to the details of the construction and the approval of the materials. 1. That the CONTRACTOR agree to renovate and renovate ABC COFFEE SHOP at the price of the pesos contract: 000,000.00 (amount in words). That We, (name of the contractor), adult, single/married, a resident of (the address), the following referred to as contractor and (owner`s name), adult, single/married, a resident (address) and below known as owner, accept and declare: 8.

That 10% of payments to the CONTRACTOR are withheld by the holder as a guarantee of the completion of the work. Painting, tiles and wall finishes, as in the surface calendar Install pine lamps, special drop lights, recessed lighting, halogen steering lamps and other electrical requirements, as indicated in the plans. Install polyvinyl tube (PVC) for sewers and waste line with solvent cement fitting (ASTM D2564) Shelves, cabinet doors, laminates and other surface details: according to the waterproof specification all wetlands with Hygard, Thoroseal or approved equivalent IN WITNESS, the parties execute this agreement on the day and year before the writings. Install 12 mm thick glass plates (exterior walls) with a work-compliant frame on the Height 1, 2, 3) signage plans Install high-density polypropylene (PP-R) pipes for water pipe Install 12 x 12 Mariwasa ceramic tiles (Montalban Beige – Red). CONSIDERING that the ENTITY wishes that contractor to exectue DESIGN AND BUILD OF RENOVATION AND UPGRADING OF NEURO-WARD (here called “works”) and the ENTITY has accepted the offer for twelve million nine hundred six hundred six hundred and thirty-two pesos and eighty-eight centavos (Php 12,906,632.87) by the CONTRACTOR for the execution and completion of such work. Use plasterboard as a blanket, finished with a coat of seals and followed by two semi-brilliant enamels with finish in the shape of the Philippine Republic Department of Health Davao RegionSouthern PHILIPPINES MEDICAL CENTERJ.P. Laurel Avenue. Davao City 9. That the withholding guarantee be released no later than two (2) weeks after the owner`s acceptance of the renovation carried out. CET ACCORD, made on January 8, 2015, between SOUTHERN PHILIPPINES MEDICAL CENTER, with office address in Bajada, J.P. Laurel, Davao City (hereafter referred to as “ENTITY”) and RIEZL LANDCARE – CONSTRUCTION, with main address in Cor.